Note
: This is the base content and may change based on requirement
SAP PP
COURSE CONTENT
Overview of ERP
About SAP
SAP Hierarchy Structure
Master Data
·
Material Master
·
Bill of Material – BOM
·
Work Center
·
Routing – Different types of
Routing
·
Production Version
Sales and Operational Planning – SOP
·
Standard Planning (with
standard so76 info structure)
·
Planning with the Product
Groups
·
Planning with the Materials
·
Product Group Aggregation and
Desegregation
·
Creation of Plan and version
management
·
Transfer of Plan to Demand
Management
Master Planning
·
Demand Planning
·
Creation of PIR (Planned
independent requirements)
·
Planning Strategies
Planning Material Requirement
·
Master Data requirements in MRP
·
Carrying MRP Procedure MRP,
MPS, CBP
·
Difference
between MRP Vs MPS
·
Control indicators Processing
like NETCH, NETPL, NEUPL
·
Evaluation of planning results
and planning table
·
Master Production Scheduling
planning run (MPS RUN)
·
MRP Run In Background for all
network Plants
·
Processing Planned orders
·
Planned orders conversion
·
Production Orders from planned
orders
·
Production order creation
·
Production
order confirmation
Goods Movement in PP
·
Goods Receipt wref to
Production Order
·
Goods Issue wref to Production
Order
·
Creation of GI wref to
Reservation
·
Restricting Goods Receipt
Unless Production Order is Confirmed